EXPERIENCE

Port Projects

TANJUNG PELEPAS PORT
ASSESSMENT OF BERTHS 1-6 (PHASE 1) AND 7-12 (PHASE 2)
Johor, Malaysia – 2013-2014
Our staff carried out a detailed inspection and assessment of 4,320m of wharf, which forms Phases 1 and 2 of the port development at Tanjung Pelepas. The assessment was carried out to determine if the existing wharf structures are able to withstand the mooring and berthing forces from the new generation of container vessels (Triple ‘E’ Class) and to identify what strengthening work would be required to upgrade the wharves for the new vessels.

TANJUNG PELEPAS PORT
DESIGN REVIEW OF BERTHS 13 & 14 (PHASE 3)
Johor, Malaysia – 2013-2014
Our staff carried out a 3rd party review of the design of the proposed Phase 3 berths at PTP (Berths 13 & 14). The review was to check the overall stability of the wharf structures and the ability to withstand the mooring and berthing loads from the Triple ‘E’ Class container Vessels.

TANJUNG PELEPAS PORT
LOADING-IN OF CONTAINER CRANES
Johor, Malaysia – 2013-2014
Our staff carried out a preliminary review of the Contractor’s proposal for loading–out old container cranes at Berth No. 7 and for loading-in new container cranes at Berth No. 12. The work required a preliminary analysis of the reinforced concrete deck structure to ensure the proposed arrangement for the steel skid beams was compatible with the stiffness of the existing concrete deck and the loads could be safely distributed to the supporting piles.

  • Lumut, Perak, Malaysia – Design of two pipe gantry systems, a new barge berth and a new liquid chemical berth for Lumut Maritime Terminal.
  • Pulau Indah, Port Klang, Malaysia – Preparation of insurance report and tender document for repair following an accident at Dry Bulk Terminal 1, Westports.
  • Pulau Indah, Port Klang, Malaysia – Preparation of insurance report and tender document for repair following an accident at Container Terminal 3, Westports.
  • Pulau Indah, Port Klang, Malaysia – Site inspection, technical review and documentation audit on completed Continuous Ship Unloader (CSU) at Dry Bulk Terminal 2, Westports.
  • Port Klang, Malaysia – Detailed assessment for fender upgrade at Berths 8, 9, 10 and 11 to allow larger vessels to use the 30- years old wharves at Northport.
  • Pulau Indah, Port Klang, Malaysia – Design and project management of Phase 2 and Phase 3 developments of Westports, including container wharves, container yard, land reclamation, a cement jetty and on-shore facilities for dry bulk terminal and liquid bulk terminal.

 

.

Contact Us at : info@tclmaritime.com.my for latest projects and updates